In Sequence diagram of Change Itinerary, how to include Prepare Itinerary Use Case

 
Sam Gehouse
Ranch Hand
Posts: 281
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
What are the ways of meeting the following requirement?
The requirement is:
It says that the Sequence diagram of Change Itinerary includes Prepare Itinerary Use Case.

Do I need to include all the classes of Prepare Itinerary in Change itinerary sequence diagram?

Or, what approach should I take?
 
Pham Huy Anh
Ranch Hand
Posts: 41
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
Hi Sam Gehouse,

Actually, I have the same concern.

I think the Prepare Itinerary is serve for creating the whole Itinerary (not for segment). So in my opinion, we cannot include Prepare Itinerary Use Case inside Change Itinerary Use Case.

Did you find the solution on your side. Or someone please give me some hints

Maybe I will assume that FBN want to do thing similar to Prepare Use case not dedicate to Prepare Use case.

Thanks in advance.
 
Marc Peabody
pie sneak
Sheriff
Posts: 4727
Mac Ruby VI Editor
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
At least for that example the referenced use cased isn't until the end. A simple note at most I think would be sufficient.

You'll need something similar in another, worse case where the Prepare Itinerary mentions "System prices the itinerary" before the end, which implies the Price Itinerary use case.
 
Jesus Angeles
Ranch Hand
Posts: 2068
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
There is a 'ref' operator for frames that we can use (UML 2.0).
 