This week's book giveaway is in the OCAJP forum.
We're giving away four copies of Programmer's Guide to Java SE 8 Oracle Certified Associate (OCA) and have Khalid A Mughal & Rolf W Rasmussen on-line!
See this thread for details.
Win a copy of Programmer's Guide to Java SE 8 Oracle Certified Associate (OCA) this week in the OCAJP forum!
  • Post Reply
  • Bookmark Topic Watch Topic
  • New Topic

Switching the rich Calendar Control to allow manual date input

 
Shiny Angel
Greenhorn
Posts: 4
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
Hi,

I am using rich:calendar control. Here I have a requirement in which a user should be allowed to manually input the date. I have given enableManualInput = "false". So in the control, the user can not enter his own input. Is there any way the user himself can turn off the calendar control and enter manual input?

Consider the default date in the calendar control is current date say Mar 09, 2010. If the user wants to enter a date of year 2070, he has to click the nextyear control nearly 60 times, there he demands for an option to enter manual input. So by default the calendar control should have enableManualInput = "false" and the user should be allowed to change it to manual.

Thanks,
Sri.
 
  • Post Reply
  • Bookmark Topic Watch Topic
  • New Topic