• Post Reply Bookmark Topic Watch Topic
  • New Topic

Having trouble with SpeedDating class and test class. I need help on printing something.  RSS feed

 
Jose Castellanos
Greenhorn
Posts: 3
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
This is a method within the speed dating class.

This is a part of the test class.

I need help with printing out how many days are in between the two dates that the user inputs.
 
Knute Snortum
Sheriff
Posts: 4276
127
Chrome Eclipse IDE Java Postgres Database VI Editor
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
Probably somewhere between line 6 and 7 you should increment count.
 
Knute Snortum
Sheriff
Posts: 4276
127
Chrome Eclipse IDE Java Postgres Database VI Editor
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
And Welcome to the Ranch!
 
  • Post Reply Bookmark Topic Watch Topic
  • New Topic
Boost this thread!