• Post Reply Bookmark Topic Watch Topic
  • New Topic
programming forums Java Mobile Certification Databases Caching Books Engineering Micro Controllers OS Languages Paradigms IDEs Build Tools Frameworks Application Servers Open Source This Site Careers Other all forums
this forum made possible by our volunteer staff, including ...
Marshals:
  • Campbell Ritchie
  • Ron McLeod
  • Paul Clapham
  • Bear Bibeault
  • Junilu Lacar
Sheriffs:
  • Jeanne Boyarsky
  • Tim Cooke
  • Henry Wong
Saloon Keepers:
  • Tim Moores
  • Stephan van Hulst
  • Tim Holloway
  • salvin francis
  • Frits Walraven
Bartenders:
  • Scott Selikoff
  • Piet Souris
  • Carey Brown

04/29/18 deployment

 
Sheriff
Posts: 6631
1254
IntelliJ IDE jQuery Eclipse IDE Postgres Database Tomcat Server Chrome Google App Engine
  • Likes 2
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator
We just deployed a new version of of the forum software. Here is a list of new features it contains:

  • Devaka - electricity made 178% efficient by replacing fluorescent bulbs with incandescent bulbs in cabin 12
  • Devaka - Fix bug where the full screen mode of threads prevented the view count being updated
  • Devaka - Fix bug where best this month was broken
  • Devaka - Show attachments on full screen mode of a thread
  • Devaka - shielded the primary shuttle from the messier 83 gamma ray burst
  • Devaka - Fix bug where category pagination showed more pages than what they actually had
  • Devaka - Feature to define shippable and non-shippable premium content
  • Devaka - Improve user profile URLs
  • Devaka - connect more solar cells to the undervolt main B bus
  • Devaka - fine-tune the lorentz force in the main z-pinch system
  • Devaka - increase the magnetic field intensity of the primary cyclotron
  • Devaka - completed another round of 3C273 quasar flyby
  • Devaka - shark tank expansion
  • Devaka - primary weapon made 4% more efficient
  • Devaka - replace electrodes of the gridded ion thruster
  • Devaka - corrected a 5.39x10⁻⁴⁴ seconds offset found in the main atomic clock
  • Devaka - main engine reconnected to another electron pump
  • Devaka - added to level 5 diagnostic for long range sensors
  • Devaka - alligator pit trap door mechanism adjustment
  • Devaka - Fix bug where downloading an attachment while not logged in failed in certain cases
  • Devaka - removed the dead tribbles from shuttle pod 7
  • Devaka - fix the broken vacuum beam lines in the primary electrostatic nuclear accelerator
  • Devaka - Feature to see a graph of tracker conversions
  • Devaka - clean out the kraken cave
  • Devaka - boost the main engine thrust by a magnitude of 3.14
  • Devaka - robot goat army finally has actual targeting so THAT won't happen again
  • Devaka - lava routed to a lower level, opening up three more bunk rooms for henchmen
  • Devaka - found the droids we were looking for
  • Devaka - cleaned that weird goo out of transporter room 2
  • Devaka - Improve the generic error message
  • Devaka - Exclude shipping cost from affiliate cut of premium threads
  • Devaka - When a logged in user without pie tries to access a pie-only forum, show a message with links to buy pie
  • Devaka - When a non-logged in user tries to access a pie-only forum, show a message on the log in page
  • Devaka - safety cover installed over self destruct button
  • Devaka - bring the flux capacitor online
 
Marshal
Posts: 70215
281
  • Likes 1
  • Mark post as helpful
  • send pies
  • Quote
  • Report post to moderator

Devaka Cooray wrote:electricity made 178% efficient by replacing fluorescent bulbs with incandescent bulbs in cabin 12

But I got 179% by replacing the bulbs with candles. Oddly enough it didn't work for the ceiling lamps, and having to replace the burnt ceiling was a bit of an annoyance.

Well done
 
    Bookmark Topic Watch Topic
  • New Topic