posted 6 years ago
- Devaka - dilithium crystal calibration
- Devaka - shark tank trap door mechanism adjustment
- Devaka - main engine reconnected to another electron pump
- Devaka - Maintain correct cases with autolinks
- Devaka - Fix the leaderboard layout which was broken when not logged in
- Devaka - strengthen the intensity of main ultrasonic transducers
- Devaka - undocked the command module from the secret mission module
- Devaka - corrected a 5.39x10⁻⁴⁴ seconds offset found in the main atomic clock
- Devaka - removed the dead tribbles from shuttle pod 7
- Devaka - shielded the primary shuttle from the messier 83 gamma ray burst
- Devaka - temporary jump jets added to escape pod 7
- Devaka - Fix bug where the forum pagination was hiding some topics
- Liutauras - connect the lightning rod to the top of the clock tower
- Liutauras - clean up the broken indium phosphide crystals
- Liutauras - fine-tune the lorentz force in the main z-pinch system
- Devaka - clean out the kraken cave
- Devaka - bring the flux capacitor online
- Devaka - Improve CSRF prevention.