Problem: You are the organiser of a conference and need to schedule presentations. You have received requests from N presenters stored in the csv file along with other details as
Presenter Name,No. of Hours for Presentation,Cost benefit for presenter P1,2,$100 P2,4,$200 P3,2,$50 .. Pn,1,$400
·The first column is the presenter name ·Second column indicates number of hours presenter
will take for the presentation (assume it to be an integer) · Last one indicates the associated
cost (Fees that presenter will charge).
You are given that your conference will last for N hrs (N taken as an input) divided into 3
sessions (with no breaks and back to back presentation for example 8 hrs=3+3+2 hrs) and any
of the session do not exceed N/2 hours.
I need a logic for below case
Maximize the number of presenters - Select the case that fits in maximum number of presenters
in the given time schedule. If multiple cases satisfy this scenario, select the ones with minimum
cost.
A session need not be fully utilized. But it should not be left empty without a presentation or. In
case all the 3 sessions can’t be filled then output should be Not enough presenters.